What we assess

We define the survey purpose: defects, reconstruction, changed loads or continued-use assessment. Under Order 263, effective from 1 July 2026, the provider is selected by the building’s responsibility level: an accredited legal entity or appropriately certified specialist within the permitted scope. Visual, instrumental and calculation work is specified. The specialists who conduct the survey prepare and sign the conclusion; PLANCK coordinates inputs and communication.

What to prepare

  • Facility address and purpose
  • Design documents and drawings
  • Changes, defects and proposed loads

What you receive

A survey programme and technical report addressing the agreed objective.

Sources & regulatory basis

Regulatory basis checked:

Timing & cost

Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.