Which document you need and why
Certificate or declaration under CU TR 016/2011; 010/032 documents for relevant objects
CU TR 016/2011 requires certification for household gas cookers, heating boilers and certain regulators, and declaration for some controls and gas-regulating valves. The document covers a defined appliance type with specified gas, pressure and installation conditions. Using gas does not automatically bring all equipment under 016: industrial processes, steam boilers and other exclusions require their own review, including 010 and 032 where relevant.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Provide gas type and composition, inlet pressure, heat input, heat-transfer-fluid temperature and pressure, gas train diagram and controls list. Specify domestic or process use, flue arrangement, installation location and batch models, with passport and installation instructions.
Which requirements we check
- Purpose and equipment listing
- Gas and pressure compatibility
- Gas train tightness
- Ignition and flame supervision
- Safe combustion-product removal
- Warnings and installation conditions
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Issued certificate or declaration for the gas appliance type after successful completion of the applicable procedure, or a written requirements assessment for products outside mandatory scope
- Required test reports
- Reviewed passport and installation instructions
- Agreed gas and pressure marking
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
