Which document you need and why
Order 435 certificate or CU TR 032 document; sanitary documents according to use
Construction pipes and fittings matching Appendix 4 of Order 435 require national certification; pressure piping is assessed against CU TR 032 scope and categories. The word pipe alone cannot select the route: transmission pipelines, individual components and below-threshold items need separate exclusion checks. Drinking-water contact requires review of sanitary requirements and state registration under Decision 299; a national certificate does not replace required sanitary evidence.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Provide manufacturing standard, outside and nominal diameters, wall thickness, pressure, temperature, fluid properties and section layout. Fittings need drawings, material grade and connection details; drinking-water applications need information on wetted layers, coatings and service conditions.
Which requirements we check
- Construction or process use
- Exact list entry
- Pressure category and fluid group
- Dimensions, joints and strength
- Drinking-water suitability
- Batch marking and manufacturer records
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Certificate, declaration or state registration where applicable and successfully completed
- Included test reports
- Prepared technical and shipment documentation
- Documented limits of the assessed use
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
