Which document you need and why

Certificate or declaration where applicable; high-voltage and passive-equipment exclusions checked

CU TR 004 is considered within its voltage range, with the assessment form determined by use and product lists. CU TR 020 does not automatically apply to every transformer: passive equipment without active electronics must be checked against exclusions, and equipment outside CU TR 004 cannot be documented under it merely for import. Electronic components, supplied power units and special functions require configuration-specific assessment; one tariff code does not determine all documents.

What to send for a quotation

Start with these four items. If something is missing, send what you have and we will explain what else is needed.

01

Product name

Name, model, intended use and manufacturer.

02

HS / EAEU commodity code

Include the code if known. If not, we can help identify the product.

03

Technical description

Specifications, photographs, instructions or a product datasheet.

04

Composition and materials

Ingredients, materials or a component specification, depending on the product.

Provide winding diagrams, primary and secondary voltages, rating, frequency, cooling, insulation class and installation conditions. Identify electronic controls, protection, enclosure and oil, intended equipment or network use, and series or batch supply.

Which requirements we check

  • Voltage scope
  • Intended and independent use
  • Dielectric strength and insulation distances
  • Heating, cooling and load rating
  • EMC testing need for electronics
  • Winding and terminal marking and installation instructions

How the process works

  1. 01

    Product

    Review the description and identify the required document.

  2. 02

    Assessment

    Check the records and arrange any required testing.

  3. 03

    Documentation

    Support the documentation and registration procedure.

  4. 04

    Your document pack

    Deliver the completed documents and agreed work results.

What you receive

  • Applicable conformity document after successful assessment
  • Included test reports
  • Contracted diagrams and operating documentation
  • An applicability explanation for the declared configuration

Sources & regulatory basis

Timing & cost

Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.