What we assess
Order No. 435 of 9 June 2023, issued by Kazakhstan’s Minister of Industry and Infrastructure Development, approved the technical regulation on the safety of buildings, structures, construction materials and products. Products in Appendix 4 require certification; those in Appendix 5 follow the declaration route. For example, cement products appear in the certification list, while specified types of sand appear in the declaration list. Intended use, composition and HS code must be considered together.
PLANCK prepares the application and technical file, coordinates sampling and testing with an accredited laboratory, and supports assessment by the conformity assessment body. Appendix 7 determines the relevant safety aspects, such as mechanical, fire, chemical and radiation safety. New or non-standard materials may require a risk assessment. We also check applicable EAEU requirements and scope limitations.
We review the manufacturer, grades and models, standard, scope and batch details in the draft certificate. The conformity assessment body issues the certificate following a positive decision; the applicant adopts a declaration. Construction material conformity assessment does not replace design appraisal, technical supervision or building acceptance.
What to prepare
- Product name, intended use, composition and HS code
- Manufacturing standard or specifications, grades and dimensions
- Manufacturer, applicant and manufacturing-site details
- Series-production details or contract, invoice and batch quantity
- Quality passport, existing test reports and label artwork
What you receive
After successful completion of the applicable procedure, the client receives an issued Kazakhstan certificate of conformity or a registered declaration, reports from the tests performed, and the documentation agreed in the contract. The conformity route, testing scope and deliverables are agreed before work starts.
Sources & regulatory basis
Regulatory basis checked:
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
