Which document you need and why
CU TR 010/2011 declaration; state registration and other documents where the specific product is covered
Equipment for preparing and purifying drinking water is listed for declaration under CU TR 010/2011. Drinking-water materials and technical devices require a separate purpose-and-code check against Decision 299: state registration is not automatic for every unit or replacement cartridge. Electrical safety, EMC and pressure requirements may add to the main document, while claimed purification performance needs its own evidence.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Provide feed and treated water uses, capacity, flow diagram, membranes and filter media, and all wetted materials. State pressure, housing volumes, temperature, power supply and claimed contaminant removal; include existing sanitary documents and water test results.
Which requirements we check
- Drinking or technical water use
- Sanitary-list applicability
- Wetted-material safety
- Housing and vessel pressure
- Electrical safety and EMC
- Evidence of claimed purification
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Issued declaration for covered water treatment equipment after successful completion of the applicable procedure, or a written requirements assessment for products outside mandatory scope
- Issued state registration certificate after successful completion of the agreed registration where required
- Prescribed test reports
- Reviewed passport, instructions and marking
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
