Which document you need and why
Certificate for household electrical equipment; 010 declaration for covered industrial units
Household electric air conditioners and heaters are checked against 004 and 020 lists, with restricted substances assessed within 037's scope. Industrial air conditioners, air heaters and refrigeration installations may require declaration under 010; covered equipment is not automatically duplicated under 004, while separate vessels are checked under 032. Documents cover a defined system and purpose, so electric heaters, gas appliances and industrial chillers are not one regulatory group.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
State application, electrical and thermal ratings, voltage, refrigerant type and charge, pressures and temperatures. Provide unit combinations, refrigerant diagram, compressor and vessel data, manual and nameplates; identify wall, floor or built-in design and any gas heating.
Which requirements we check
- Household or industrial purpose
- Unit compatibility
- Electrical protection and overheating
- Leak tightness and refrigerant safety
- EMC and 037 applicability
- Installation instructions and marking
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Issued certificate or declaration for the specified system after successful completion of the applicable procedure, or a written requirements assessment for products outside mandatory scope
- Required test reports
- List of covered unit combinations
- Agreed instruction and marking review
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
