Which document you need and why

Certificate or declaration under applicable CU TR 016, 032, 010, 004 and 020; EAEU TR 037 also applies to certain electrical products

The document confirms the specific boiler’s compliance for placement on the market. For gas boilers we check CU TR 016 scope, for pressure equipment its CU TR 032 category, and for electric versions voltage, electronics and applicable electrical regulations. A certification body issues the certificate, while the applicant adopts the declaration; PLANCK helps prepare the documents and arrange the required checks.

What to send for a quotation

Start with these four items. If something is missing, send what you have and we will explain what else is needed.

01

Product name

Name, model, intended use and manufacturer.

02

HS / EAEU commodity code

Include the code if known. If not, we can help identify the product.

03

Technical description

Specifications, photographs, instructions or a product datasheet.

04

Composition and materials

Ingredients, materials or a component specification, depending on the product.

For a quotation, provide fuel type, heat output, maximum allowable pressure and temperature, volume, burner and control diagrams, passport and whether supplied as a boiler or boiler-house module.

Which requirements we check

  • Gas-regulation scope and exclusions
  • Category by pressure, volume and working fluid
  • Safety valves, temperature limiters and interlocks
  • Materials, welded joints and strength calculations
  • Supply, earthing and control-system compatibility
  • Consistency of passport, instructions and model markings

How the process works

  1. 01

    Product

    Review the description and identify the required document.

  2. 02

    Assessment

    Check the records and arrange any required testing.

  3. 03

    Documentation

    Support the documentation and registration procedure.

  4. 04

    Your document pack

    Deliver the completed documents and agreed work results.

What you receive

  • A certificate or registered declaration for the agreed products, where the selected procedure requires it and assessment is successful
  • A test report where testing is required by the procedure and included in the agreed work
  • Reviewed passport, instructions or label artwork within the agreed scope
  • An applicant’s file identifying products, conditions of use and any limitations found

Sources & regulatory basis

Timing & cost

Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.