Which document you need and why
CU TR 004/2011 certificate for listed products; other documents where applicable
Household installation accessories and specified protective devices are listed for certification under CU TR 004/2011; other low-voltage equipment is assessed by intended use. A mechanical switch is not automatically an EMC emitter, and an internal microswitch is not automatically a standalone household product. Electronic controls and categories listed under 037 may need additional evidence and a restricted-substances declaration.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Specify rated voltage and current, load category, switching capacity, poles and mounting. Provide a diagram, contact and marking photos, housing material, IP rating, electronics or radio details and variant list; state the trip characteristic for circuit breakers.
Which requirements we check
- Household or industrial use
- Voltage range and listing
- Contact heating
- Insulation and touch protection
- Switching and mechanical endurance
- Marking and EMC applicability
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Issued certificate or declaration for the specified switches after successful completion of the applicable procedure, or a written requirements assessment for products outside mandatory scope
- Required test reports
- Reviewed rating marking
- Agreed instructions and technical package
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
