Which document you need and why
Applicable TR conformity document; type approval, metrological attestation or verification where required
Electrical safety and EMC follow the scopes of CU TR 004/2011 and 020/2011, while measuring instruments are expressly excluded from EAEU TR 037/2016. Use within Kazakhstan's state metrological control requires review of type approval or metrological attestation and verification requirements; calibration does not replace mandatory verification. A laboratory heater without a measuring function and a measuring instrument are different objects, so 'laboratory equipment' alone cannot determine the documents.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Provide measurand, range, error or accuracy class, measurement method and application. Include register details, any verification method, serial numbers, production year, supply and software; specify supply, commissioning or periodic verification.
Which requirements we check
- Measuring instrument or other equipment
- State-control application
- Type status and verification method
- Range and accuracy
- Electrical safety and EMC
- Serial numbers, software and marking
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Issued applicable instrument certificate or declaration after successful completion of the applicable procedure, or a written requirements assessment for products outside mandatory scope
- Prepared metrological submission
- Agreed testing or verification results from the authorised provider
- Reviewed passport and marking
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
