Which document you need and why
National certification for Order 435 Appendix 4 products; relevant sanitary and fire properties
The certification list includes plastic flooring under 3918, specified wooden products and linoleum under 5904, but the entire flooring range cannot receive one route without classification. Evidence covers relevant material properties, including prescribed fire/sanitary aspects; ordinary flooring is not thereby a fire-protection product under EAEU TR 043. Building use, escape-route requirements and installation systems need separate review beyond a commercial flooring label.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Provide total and wear-layer thickness, backing, surface finish, format and joints. Include use class, laying conditions, underfloor-heating compatibility, underlay/adhesive, pattern/formulation variants and project fire/sanitary requirements.
Which requirements we check
- Layer materials and list entry
- Dimensions and stability
- Wear and use class
- Applicable fire performance
- Emissions and sanitary checks in scope
- Laying, care and batch marking
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Applicable certificate or product-specific document after successful assessment
- Included reports
- Agreed material/variant dossier
- Supported performance and limitations relevant to specification
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
