Which document you need and why
CU TR 004/020 certification for relevant categories; EAEU TR 037 where applicable
Household appliances in certification lists require a certificate, while hazardous substances are assessed under EAEU TR 037. Professional use, unusual power supplies or assembly scope may change the requirements; a gas appliance is not assessed solely as electrical because it has electric ignition. Evidence covers specific models and uses, so changes to heaters, motors, food-contact parts or controls require checking existing evidence.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
State household/professional use, rating, voltage, heaters, moving parts and continuous duty. Provide diagrams, contact-surface materials, cleaning instructions, safety devices, variants, wireless modules and model differences.
Which requirements we check
- Function and category
- Electrical protection and insulation
- Heating, overheating and abnormal operation
- Moving/hot-part access
- Applicable EMC and material checks
- Warnings, cleaning instructions and marking
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Applicable certificate or declaration after successful assessment
- Included reports
- Agreed model and accessory dossier
- Instruction and marking comments to resolve before completion
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
