Which document you need and why
CU TR 010/2011 declaration where applicable; 032/2013 certificate or declaration for vessels
A pump-based hydraulic power pack is checked against CU TR 010/2011 and the declaration list. An accumulator may be an independent vessel under CU TR 032/2013, with its route determined by category; high pressure alone does not make every cylinder such a vessel. Regulation 032 excludes machine parts that are not independent vessels, so power pack, accumulator and cylinder documents follow their actual functions.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Provide the hydraulic diagram, maximum pressure, fluid, temperature and pump capacity. Accumulators need total volume, gas-space and precharge data; cylinders need their purpose and drawing; power packs need valve, drive and protection lists and supply arrangements.
Which requirements we check
- Component function and independence
- Allowable pressure and vessel category
- Fluid–seal compatibility
- Overpressure protection
- Leakage and safe maintenance
- Diagram, passport and warnings
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Issued declaration or certificate for the identified equipment after successful completion of the applicable procedure, or a written requirements assessment for products outside mandatory scope
- Applicable test reports
- Reviewed hydraulic diagram and passport
- Coordinated instructions and marking
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
