Which document you need and why
CU TR 016/2011 certificate or declaration; 010/2011 declaration for specified process burners
Industrial packaged gas and dual-fuel burners are listed for certification under CU TR 016/2011, while certain household burner devices are listed for declaration. Non-packaged gas and dual-fuel burners for industrial processes are checked against the relevant CU TR 010/2011 listing. The correct document must cover the actual version and use, with electrical and EMC requirements considered by scope rather than simply because a power cable is present.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Specify packaged or non-packaged design, furnace or boiler purpose, output range, gas type and pressure, fan and modulation mode. Provide the gas train, control configuration, supply ratings, manual and tests, and identify complete-burner or component supply.
Which requirements we check
- Burner design and applicable regulation
- Gas and output range
- Ignition sequence
- Shut-off on flame failure
- Tightness and combustion stability
- Instructions and control configuration
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Issued certificate or declaration for the burner after successful completion of the applicable procedure, or a written requirements assessment for products outside mandatory scope
- Prescribed test reports
- Reviewed diagram and manual
- Coordinated marking and variant list
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
