Which document you need and why

CU TR 010 certificate or declaration for relevant machinery; lift certification and separate post-installation assessment under CU TR 011

For cranes, hoists and conveyors, the route follows the CU TR 010 lists. A lift’s market-placement certificate does not replace CU TR 011 declaration and technical examination after installation and before commissioning. A certification body issues the certificate, while the applicant adopts the declaration; PLANCK helps prepare the documents and arrange the required checks.

What to send for a quotation

Start with these four items. If something is missing, send what you have and we will explain what else is needed.

01

Product name

Name, model, intended use and manufacturer.

02

HS / EAEU commodity code

Include the code if known. If not, we can help identify the product.

03

Technical description

Specifications, photographs, instructions or a product datasheet.

04

Composition and materials

Ingredients, materials or a component specification, depending on the product.

Provide capacity, lifting height and speed, drive type, duty, goods or persons carried, installation layout, brakes and limiters, passport, year of manufacture and condition.

Which requirements we check

  • Correct machinery or lift identification
  • Strength of supporting and load-handling parts
  • Brakes, limiters and overload protection
  • Limit switches, interlocks and emergency stopping
  • Guards and access to hazardous movement zones
  • Passport and safety-device document completeness

How the process works

  1. 01

    Product

    Review the description and identify the required document.

  2. 02

    Assessment

    Check the records and arrange any required testing.

  3. 03

    Documentation

    Support the documentation and registration procedure.

  4. 04

    Your document pack

    Deliver the completed documents and agreed work results.

What you receive

  • A certificate or registered declaration for the agreed products, where the selected procedure requires it and assessment is successful
  • A test report where testing is required by the procedure and included in the agreed work
  • Reviewed passport, instructions or label artwork within the agreed scope
  • An applicant’s file identifying products, conditions of use and any limitations found

Sources & regulatory basis

Timing & cost

Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.