Which document you need and why
National Order 435 certification for covered 2520, 2522 and 2523 products
Cements, building lime and gypsum binders in these headings are included in Appendix 4’s mandatory certification list. The document concerns the specific binder; an industrial chemical reagent, ready-made plaster mix or gypsum article needs separate identification and is not automatically covered by a raw-material certificate. Cement assessment also follows the national cement and clinker conformity procedure referenced by the regulation and the evidence required by the selected scheme.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
State binder type/class, mineral additions, standard, setting times and storage. Provide factory/line data, formulation consistency, factory control results, packaging, series or batch volume and sampling availability.
Which requirements we check
- Binder type and list entry
- Formulation and additions
- Strength at required ages
- Relevant fineness, setting and soundness
- Batch traceability and factory control
- Class, mass and storage marking
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Conformity-body certificate after successful completion
- Included reports
- Declared product/factory dossier
- Supported performance and supply conditions reflecting assessment results
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
