Which document you need and why

CU TR 010/2011 declaration for listed abrasive tools

CU TR 010/2011 lists grinding, cutting, polishing and certain other abrasive tools for declaration, based on the prescribed evidence. The declaration supports market entry of the covered products; a test report records tested characteristics and does not replace it. Loose abrasive grain, pastes, hand stones and complete machines must be assessed separately rather than automatically grouped with wheels.

What to send for a quotation

Start with these four items. If something is missing, send what you have and we will explain what else is needed.

01

Product name

Name, model, intended use and manufacturer.

02

HS / EAEU commodity code

Include the code if known. If not, we can help identify the product.

03

Technical description

Specifications, photographs, instructions or a product datasheet.

04

Composition and materials

Ingredients, materials or a component specification, depending on the product.

Also provide a drawing or marking photograph, outside and bore diameters, thickness, bond and abrasive type, maximum rotational speed and operating speed. Specify handheld or stationary use, the material being worked, the size range and any existing tests.

Which requirements we check

  • Whether the tool type is listed
  • Consistency of speed and diameter
  • Strength and fracture risk
  • Mounting compatibility
  • Work-material restrictions
  • Warnings and storage life

How the process works

  1. 01

    Product

    Review the description and identify the required document.

  2. 02

    Assessment

    Check the records and arrange any required testing.

  3. 03

    Documentation

    Support the documentation and registration procedure.

  4. 04

    Your document pack

    Deliver the completed documents and agreed work results.

What you receive

  • Issued declaration for covered abrasive tools after successful completion of the applicable procedure, or a written requirements assessment for products outside mandatory scope
  • Required test reports
  • Reviewed speed marking
  • Agreed technical documentation package

Sources & regulatory basis

Timing & cost

Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.