Which document you need and why
Order 435 certification for listed mortars and preparations; other mixes require exact identification
Preparations matching 382450 or 3816 in Order 435 Appendix 4 require certification. Dry adhesives, fillers, chemical additives and binders are not one category: classification and any additional sanitary requirements need separate review. Evidence covers the stated product and application; plaster results cannot automatically cover tile adhesive or a formulation with a different binder, mixing-water ratio or declared use.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
State binder, substrate, layer thickness, water ratio, application conditions and required strength/adhesion. Provide formulation with functional additives, preparation instructions, interior/exterior use, variants, manufacturing standard and factory control data.
Which requirements we check
- Use and exact classification
- Formulation/additives
- Strength, adhesion and substrate compatibility
- Applicable pot life, working time and water retention
- Exterior/wet-use durability
- Mixing instructions, consumption and batch marking
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Applicable document after successful conformity assessment
- Included test reports
- Agreed formulation dossier
- Checked use, mixing and limitation information with required corrections
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
