Which document you need and why

CU TR 010/2011 certificate or declaration, plus applicable Ex and pressure documents

CU TR 010/2011 distinguishes certified borehole drilling equipment from oilfield and geological exploration equipment subject to declaration, so 'drilling rig' alone is insufficient. Regulation 012 is checked for Ex equipment and 032 for independently assessed vessels or other covered pressure units. Documentation must cover the declared rig and supplied package; a motor or pump certificate does not replace complete-machine assessment.

What to send for a quotation

Start with these four items. If something is missing, send what you have and we will explain what else is needed.

01

Product name

Name, model, intended use and manufacturer.

02

HS / EAEU commodity code

Include the code if known. If not, we can help identify the product.

03

Technical description

Specifications, photographs, instructions or a product datasheet.

04

Composition and materials

Ingredients, materials or a component specification, depending on the product.

Provide overall drawings, drilling method and depth, drive type, power, unit list and operating location. Hazardous areas need Ex parameters; vessels need pressure, volume and fluid data. Specify mobility, supplied configuration and factory testing.

Which requirements we check

  • Purpose and 010 listing
  • Hazardous moving parts
  • Stability and loads
  • Emergency stopping and controls
  • Ex parameters where applicable
  • Pressure and passport completeness

How the process works

  1. 01

    Product

    Review the description and identify the required document.

  2. 02

    Assessment

    Check the records and arrange any required testing.

  3. 03

    Documentation

    Support the documentation and registration procedure.

  4. 04

    Your document pack

    Deliver the completed documents and agreed work results.

What you receive

  • Issued certificate or declaration for the rig after successful completion of the applicable procedure, or a written requirements assessment for products outside mandatory scope
  • Required test reports
  • Coordinated passport and manual
  • Agreed documentation for separately regulated units

Sources & regulatory basis

Timing & cost

Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.