Which document you need and why
Certificate or declaration under applicable CU TR 004 and 020; CU TR 010 is additionally assessed for welding machinery and cells
A conformity document for a welding power source confirms compliance with product requirements; it does not qualify the welder or approve the welding procedure. Robotic cells also require review of mechanical hazards, guarding and common controls, so a source certificate does not replace assessment of the whole cell. A certification body issues the certificate, while the applicant adopts the declaration; PLANCK helps prepare the documents and arrange the required checks.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Specify welding process, open-circuit voltage, current range, duty cycle, supply, cooling and intended use class. Automated equipment also needs movement diagrams, guards, interlocks and the cell’s supply scope.
Which requirements we check
- Power-source or complete-machine identification
- Insulation, earthing and electric-shock protection
- Heating at the stated duty cycle
- Electromagnetic emissions and control immunity
- Hazardous movements and cell interlocks
- Rating-plate data and safe-use instructions
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- A certificate or registered declaration for the agreed products, where the selected procedure requires it and assessment is successful
- A test report where testing is required by the procedure and included in the agreed work
- Reviewed passport, instructions or label artwork within the agreed scope
- An applicant’s file identifying products, conditions of use and any limitations found
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
