Which document you need and why
Order 435 national certificate for covered 382450 mixes and 6810 products
Non-refractory mortars/concretes and cement, concrete or artificial-stone articles are listed in Appendix 4 for certification. The certificate concerns the product, not acceptance of a completed building; design calculations, incoming inspection and work records remain separate. Refractory mixes, special uses and differently classified articles need their own entry and method checks. Cement documentation does not replace documentation for the resulting mix or element.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Provide strength, consistency, freeze-thaw and watertightness classes as claimed. Precast elements need drawings, reinforcement, design loads and production control; mixes need delivery conditions, sampling arrangements, batching plant and specimen reports.
Which requirements we check
- Mix versus article and list entry
- Formulation and production control
- Strength and specimen curing
- Precast geometry, reinforcement and cover
- Relevant durability
- Batch identity, quality passport and marking
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- National certificate after successful assessment
- Included reports
- Agreed mix/element-series dossier
- Supported properties, comments and production-site coverage
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
