What we assess
Production process, product contact, cleaning and automation. Food lines require particular attention to contact-surface materials.
Product examples
Mixers, packaging lines, process installations
Requirements to check
The following are assessment directions, not an automatically mandatory document set. Each regulation’s scope, exclusions and overlaps are reviewed against the technical description.
Machinery and equipment
Machine function, hazardous zones, control system and protective devices
Low-voltage equipment
Supply voltage, current type, intended use and electrical protection
Electromagnetic compatibility
Electronic assemblies, emissions, immunity and operating environment
Pressure equipment
Design pressure, volume or diameter, fluid group and equipment category
What to prepare
- Purpose, operating principle and technical parameters
- Models, drawings and equipment configuration
- Working medium, loads and operating conditions
- Passport, manual and manufacturer information
- Reports, calculations and existing certificates
What you receive
You receive a requirements and document list, the basis for product grouping, a testing plan and necessary technical inputs. Cost and timing follow review of the project scope.
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
Request a consultation