Which document you need and why
EAEU TR 043/2017 certification for fire-protection products within scope
The certificate addresses the fire-protection product and declared use where it falls within EAEU TR 043. Ordinary decorative or heat-resistant paint is not fire protection merely because of advertising, and a coating certificate does not prove any structure’s fire resistance after arbitrary application. Chemical formulations also require review of applicable sanitary/state-registration requirements; handling rules and SDS support, rather than replace, fire-performance assessment.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Provide protected material, construction, claimed effectiveness/fire rating, consumption and dry film thickness. Include application instructions, compatible primers/topcoats, application/service conditions, formulation, coating life and reports for the actual system.
Which requirements we check
- Fire-protection identity and TR 043 scope
- Substrate/layer compatibility
- Consumption and thickness matching tested configurations
- Assessed fire-protection effectiveness
- Durability and service limits
- Marking, application and coating quality control
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Competent-body certificate after successful completion
- Included fire and other test reports
- Documented assessed system
- Supported properties, thicknesses and use conditions
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
