Which document you need and why
Order 435 certificate/declaration by exact entry; other types assessed separately
Order 435 Appendix 4 includes specified plastic articles and glass fibre, while cement-bonded wood products under 6808 appear in Appendix 5’s declaration list. Entry 6806209000 does not automatically cover all mineral wool: other classifications require their own assessment basis rather than a certificate selected by similar name. An insulation document addresses the stated product and does not replace assessment of the complete facade system, fixings or fire-safety design.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Provide fibre/polymer type, binder, density, thickness, facing and declared thermal conductivity. State location, moisture conditions, fire performance, installation, decorative/foil layers, sizes and earlier test evidence.
Which requirements we check
- Formulation and classification
- Exact certificate/declaration entry
- Thermal conductivity and density conditions
- Water uptake, strength and dimensional stability
- Relevant fire performance
- Marking, installation limits and facing variants
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Applicable document where legally required and successfully assessed
- Included test reports
- Agreed variant dossier
- Supported properties and separate system-assessment questions
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
