Which document you need and why

CU TR 012/2011 certificate of conformity

Equipment within CU TR 012/2011 requires certification assessing prevention of ignition of the surrounding explosive mixture. The certificate covers a defined design, group, protection concept and operating conditions; an Ex nameplate alone is not proof of conformity. ATEX or IECEx documents can assist evidence preparation but do not replace EAEU certification, and Ex components must be distinguished from complete equipment.

What to send for a quotation

Start with these four items. If something is missing, send what you have and we will explain what else is needed.

01

Product name

Name, model, intended use and manufacturer.

02

HS / EAEU commodity code

Include the code if known. If not, we can help identify the product.

03

Technical description

Specifications, photographs, instructions or a product datasheet.

04

Composition and materials

Ingredients, materials or a component specification, depending on the product.

Provide the proposed full Ex marking, drawings, critical-component list, ambient temperature range and protective-device descriptions. Specify gas or dust atmosphere, group, temperature class, supply type and existing ATEX/IECEx certificates with schedules and test reports.

Which requirements we check

  • Protection concept and construction
  • Group and protection level
  • Surface temperatures
  • Sparking and electrostatic risks
  • Critical components and joints
  • Consistency of Ex marking and instructions

How the process works

  1. 01

    Product

    Review the description and identify the required document.

  2. 02

    Assessment

    Check the records and arrange any required testing.

  3. 03

    Documentation

    Support the documentation and registration procedure.

  4. 04

    Your document pack

    Deliver the completed documents and agreed work results.

What you receive

  • Issued CU TR 012/2011 certificate of conformity after successful completion of the applicable procedure, or a written requirements assessment for products outside mandatory scope
  • Required test reports
  • Reviewed Ex marking and instructions
  • Agreed technical file

Sources & regulatory basis

Timing & cost

Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.