Which document you need and why
CU TR 010 or 032 document; electrical and sanitary requirements according to configuration and use
A complete filtration unit follows applicable equipment requirements; a pressure housing is assessed by CU TR 032 parameters and category. A replacement cartridge does not become a machine or vessel merely because it fits inside a filter. Drinking-water treatment products need a separate sanitary and state-registration review under Decision 299. Electric drives and controls require the relevant safety and EMC assessment rather than one automatic document for all filters.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Specify fluid, treated-product use, flow, pressure, temperature, housing volume and connection sizes. Include system diagrams, filter medium, regeneration, pumps and electrical components, replacement instructions and existing tests.
Which requirements we check
- Element, housing or assembly identification
- Pressure category and service conditions
- Material compatibility
- Claimed efficiency and evidence
- Safe servicing and replacement
- Relevant sanitary and electrical requirements
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Applicable certificate, declaration or registration after successful completion
- Included test reports
- Dossier for the agreed configuration
- Use limits and actions required before design changes
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
