Which document you need and why

Order 435 Appendix 4 certification; Appendix 5 declarations for specified special bricks

Ceramic building bricks and units under 6904 are on the certification list; concrete/artificial-stone units are checked under 6810. Refractory bricks under 6902 and siliceous-fossil-meal products under 6901 are on the declaration list, so one route cannot be promised for all bricks. National conformity evidence concerns material properties and does not replace wall design, mortar selection or compliance with the building project.

What to send for a quotation

Start with these four items. If something is missing, send what you have and we will explain what else is needed.

01

Product name

Name, model, intended use and manufacturer.

02

HS / EAEU commodity code

Include the code if known. If not, we can help identify the product.

03

Technical description

Specifications, photographs, instructions or a product datasheet.

04

Composition and materials

Ingredients, materials or a component specification, depending on the product.

Provide manufacturing standard, dimensions, void ratio, density, strength and freeze-thaw grades. Include loadbearing/facing use, firing or curing process, production site, raw-material variants, batch size and available test results.

Which requirements we check

  • Brick type and list entry
  • Dimensions, geometry and voids
  • Strength and density grade
  • Relevant water absorption and freeze-thaw performance
  • Applicable radiation/sanitary properties
  • Batch marking and production consistency

How the process works

  1. 01

    Product

    Review the description and identify the required document.

  2. 02

    Assessment

    Check the records and arrange any required testing.

  3. 03

    Documentation

    Support the documentation and registration procedure.

  4. 04

    Your document pack

    Deliver the completed documents and agreed work results.

What you receive

  • National certificate or declaration after successful assessment
  • Included reports
  • Agreed grade/factory dossier
  • Performance and use limits supported by the work

Sources & regulatory basis

Timing & cost

Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.