Which document you need and why
Order 435 Appendix 4 certification; Appendix 5 declarations for specified special bricks
Ceramic building bricks and units under 6904 are on the certification list; concrete/artificial-stone units are checked under 6810. Refractory bricks under 6902 and siliceous-fossil-meal products under 6901 are on the declaration list, so one route cannot be promised for all bricks. National conformity evidence concerns material properties and does not replace wall design, mortar selection or compliance with the building project.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Provide manufacturing standard, dimensions, void ratio, density, strength and freeze-thaw grades. Include loadbearing/facing use, firing or curing process, production site, raw-material variants, batch size and available test results.
Which requirements we check
- Brick type and list entry
- Dimensions, geometry and voids
- Strength and density grade
- Relevant water absorption and freeze-thaw performance
- Applicable radiation/sanitary properties
- Batch marking and production consistency
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- National certificate or declaration after successful assessment
- Included reports
- Agreed grade/factory dossier
- Performance and use limits supported by the work
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
