Which document you need and why
Declaration or certificate under CU TR 032/2013; further documents according to assembly scope
Where the unit falls within CU TR 032, the document addresses pressure-equipment safety: categories 1 and 2 normally require declaration, and categories 3 and 4 certification, subject to special on-site manufacturing provisions. Equipment below the scope thresholds is not covered merely because it is called a heat exchanger; CU TR 010 is reviewed separately for relevant machinery within an assembly. The equipment passport and strength calculation support assessment but do not replace the required conformity document.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
For a quotation, provide each circuit’s maximum allowable pressure, temperature, volume, fluid state and group, drawings, wall materials, supply arrangement and welding information. State whether manufacture finishes at the factory or on site and identify existing calculations and tests.
Which requirements we check
- Category for each circuit
- Material compatibility with fluids
- Strength calculations and pressure joints
- Protection against parameter exceedance
- Passport, diagram and operating instructions
- Model, factory and unit traceability
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- Certificate from the competent body or registered declaration after a successful applicable procedure
- Test reports where testing is included
- Agreed technical documentation
- Outstanding comments and supply conditions
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
