Which document you need and why
Certificate or declaration under CU TR 010 and applicable electrical requirements; CU TR 012 Ex certification only for the relevant design
The route depends on purpose, design and operating conditions, not merely the trade name. A pump casing that is not an independent vessel is excluded from CU TR 032, but a separate accumulator or vessel within the set needs its own scope assessment. A certification body issues the certificate, while the applicant adopts the declaration; PLANCK helps prepare the documents and arrange the required checks.
What to send for a quotation
Start with these four items. If something is missing, send what you have and we will explain what else is needed.
Product name
Name, model, intended use and manufacturer.
HS / EAEU commodity code
Include the code if known. If not, we can help identify the product.
Technical description
Specifications, photographs, instructions or a product datasheet.
Composition and materials
Ingredients, materials or a component specification, depending on the product.
Provide fluid properties, head, flow rate, temperature, motor data, installation diagram, frequency-drive and Ex details, plus any separate tank or accumulator specifications.
Which requirements we check
- Pump purpose and set boundaries
- Material and seal compatibility with the fluid
- Guards for rotating parts and drive couplings
- Electrical safety and variable-speed drive operation
- Ex suitability for the specified area
- Separate vessel assessment and set markings
How the process works
- 01
Product
Review the description and identify the required document.
- 02
Assessment
Check the records and arrange any required testing.
- 03
Documentation
Support the documentation and registration procedure.
- 04
Your document pack
Deliver the completed documents and agreed work results.
What you receive
- A certificate or registered declaration for the agreed products, where the selected procedure requires it and assessment is successful
- A test report where testing is required by the procedure and included in the agreed work
- Reviewed passport, instructions or label artwork within the agreed scope
- An applicant’s file identifying products, conditions of use and any limitations found
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
